When you need a panel upgrade
Common reasons: adding an EV charger, heat pump, or hot tub; running out of breaker slots; an old Federal Pacific or Zinsco panel (both known fire hazards now flagged by most insurers); a 100-amp panel feeding a 2,500+ sq ft home with electric range, dryer, and water heater; or frequent nuisance breaker trips that aren't a single bad circuit.
We do a free load calculation as part of the estimate and tell you whether you can add new loads to your existing panel or actually need a 200-amp upgrade. Honest answer either way — we don't sell upgrades to homes that don't need them.
Get a Free Panel AssessmentWhat's involved in a 100A → 200A upgrade
Full service upgrade: new 200-amp main panel, new meter base (if required by code or utility), new service entrance cable, ground rod/bonding to current code, permit, utility disconnect/reconnect coordination, and inspection. Most upgrades take a single day, with power out 4-8 hours during the install.
What's included
- Free load calculation
- 100A to 200A service upgrade
- Federal Pacific / Zinsco replacement
- New meter base (if needed)
- New service entrance cable
- Grounding / bonding to code
- Permit pulled, inspection coordinated
- DTE / Consumers coordination for disconnect/reconnect
- Circuit labeling
- 10-year manufacturer warranty on panel
0% APR financing on qualifying installs
Spread your investment over 12-24 months with no interest, or use a longer-term loan for larger projects. Most homeowners get approved during the estimate. See options →